9Smart-UPS® VT 10-40 kVA 380/400/415 V - 208/220 V - 200/208 V Installation in Parallel
From UPS 1: Route the two PBus cables to the slots on the left side of the enclosure and down inside
thexpanel.
From the lowest slot fish out the cables from the side panel,xroute the cables across and through the cable
inlets of thextwo side panels.
From the bottom of UPS 2, route the PBus cables to the slots onxthe left side of the enclosure and up
inside the panel.
Fish out the PBus cables and leave them unattached to the parallel box.
Route the ABus cable from the Maintenance Bypass Panel to the slots on the left side of the enclosure and
up inside the panel the same way as for the PBus cables.
Reattach the cable-inlet cover plates.
Fasten the cables with cable ties.
Note: Proceed the routing of cables into UPS 3 and UPS 4, if applicable.