Install the floor anchoring brackets
Position the floor anchoring bracket beneath the UPS on top of the pre-drilled floor holes.
Insert two floor anchors (not supplied) through the holes in the bottom of the enclosure and through the
floor anchoring bracket into the pre-drilled floor holes (or follow the specifications provided by the
manufacturer of the floor anchors).
Each enclosure must be anchored with at least one floor anchoring bracket. A floor anchoring bracket
must be mounted at each end of a row of enclosures.