Step 5. Install the drive trays into the enclosure. Note that the drive trays
used in single- or redundant-controller subsystems are different. (See
Section 0)
Step 6. Connect the cables. Use the supplied power cords to connect the
subsystem to main power. It is recommended to connect power cords
to separate and independent power sources for higher redundancy.
Make sure your subsystem is electrically grounded.
It is also recommended to use the included cable clamps to prevent
accidental disconnection of the power cords. Use separately
purchased SCSI cables to connect the host ports to the host computers
or expansion enclosures. (See Chapter 4)
Step 7. BBU installation. Install the optional BBU module if it is included in
your order.
Step 8. Power up. Once all of the components have been properly installed
and all the cables properly connected, the subsystem can be powered
up and the RAID array configured. (See Chapter 4)
2.4.1 Installation Procedure Flowchart
Figure 2-1 shows a flowchart of the installation procedure. As you complete each step,
check off the “Donebox on the right. Please use this flowchart in conjunction with the
instructions that follow.