36 Symmetra PX 160 kW 400 V Installation 990-3017A-001
Post-Installation Checklist
If XR Battery Enclosure are installed make sure that all DC breakers are in the OFF position and that
both 300 A fuses are removed from the XR Battery Enclosures.
Check that the power wiring is torqued to: UPS 230 lbf in/26 Nm, PDU-XR 549 lbf in/62 Nm, and XR
Battery Enclosure 274 lbf in/31 Nm.
Verify clockwise phase-rotation (L1, L2, L3) and make sure a neutral connection is present.
Leave a wiring diagram on site for service personnel.
Re-install all wiring access panels on the UPS.
Re-mount the doors on all enclosures and connect the ground cables between the front doors and the
frames.
For any optional equipment, refer to product-specific manuals.