42 AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957
Floor Anchoring (option)
Floor anchoring of stand-alone systems
In seismic areas, it is recommended that the installation be bolted to the floor, and that the batteries be
secured in the Enclosure by the Battery Securing Brackets.
For floor anchoring, use the 2 transport brackets that were used to secure the UPS to the pallet
during transport.
Align the 4 holes in the bottom angle of the Floor Anchoring Bracket on either side of the UPS
to the pre-drilled holes in the floor
Floor anchoring is an option. If your installation does not include this option,
proceed to the Front Panel Installation section.
Floor anchoring procedures identical for both 13.85in/352mm and 20.59in/523 mm UPS
Enclosures.
See Floor Anchoring Preparation section and install a minimum of 4 anchors on each
Enclosure (minimum size: M8) where shown, following the specifications provided by the
manufacturer.
M
o
d
e
l:
S
e
r
ia
l:
BAT
TE
RY UN
IT
M
o
d
e
l:
S
e
r
ia
l:
BATTER
Y UN
IT
M
o
d
e
l:
S
e
r
i
a
l:
BA
TTE
RY UN
IT
M
o
d
e
l:
S
e
r
ia
l
:
B
AT
TE
RY UN
IT
M
o
d
e
l:
S
e
r
ia
l
:
BA
TTER
Y U
NIT
M
o
d
e
l:
S
e
ri
a
l:
B
ATTERY
UNIT
M
o
d
e
l:
S
e
r
i
a
l
:
BA
TT
ER
Y U
NIT
M
o
d
e
l:
S
e
r
ia
l
:
BA
TTER
Y U
NIT
M
o
d
e
l
:
S
e
r
i
a
l:
BATTE
RY
UNIT
M
o
d
e
l
:
S
e
ri
a
l:
BA
TTER
Y U
NIT
M
o
d
e
l
:
S
e
r
ia
l
:
B
ATTER
Y U
NIT
M
o
d
e
l:
S
e
r
ia
l:
BATTE
RY UN
IT
Floor Anchoring Bracket
(re-use of transport
bracket)