41Installation Guide Silcon DP300E 208V/480V 10-80 kVA
7OY0002 US rev. 04
1. Ensure that the system has been at stable environment for at least 12 hours to
ensure any condensation has been evaporated before starting up.
2. Prepare the system by opening the front door(s).
Display shows
3. Switch on the mains power supply
4. Wait about 10 seconds
5. Press
on the keyboard
6. Press
on the keyboard
7. Wait about 1 second
8. Wait about 1 minute
9. a) Systems with built-in batteries (only possible with
Silcon DP310E/DP340E). Insert F020 and F021.
b) Systems with external batteries.
Close battery MCCB’s in MCCB box or battery
cubicle.
Please refer to LED indication and labeling in
MCCB box or battery cubicle.
10. Press the green “ON“ push-button.
11. Close the front door.
Starting up
Normal operation
load power XX%
System type XXX
XXX kVA - XXX
Stop charge DC
capacitors : YES
Start charge DC
capacitors : YES
Data stored
Start charge DC
capacitors : YES
** System OFF **
The system is now started up and ready for use.
Insert fuse or
close MCB
NOTE:
If the starting up procedure for
any reason is interrupted –
wait until the display shows the
step 4 picture and repeat from
this step.
WARNING:
If “Autostart” is active (please
refer to 6.2) the UPS will start
up automatically after step 9
with a delay of 1 minute.
WARNING:
Do not insert F020 or F021 or
external battery MCCB’s with-
out the display showing “Close
MCCB” – otherwise you may
damage the UPS.
If there is a fault in the charge
circuit the display will show:
“DC capacitor charge error”.
Do not insert F020 or F21 or
close MCCB, but call for
assistance.