APC 10-40kW 208/480V Installation Guide Page 47

  • Download
  • Add to my manuals
  • Print
  • Page
    / 119
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 46
47Installation Guide Silcon DP300E 208V/480V 10-80 kVA
7OY0002 US rev. 04
6.4 Programming of battery monitor
Action Display shows
1. Press
and simultaneously to open
for password input
2. Enter password 28 28 28 by pressing
3. Press or until
4. Enter the expected back-up time in min. at
100% ohmic (pf = 1) load, when the inverter
has a mean efficiency of approx. 94%
Press
Data for DP310E: A-Pack (7Ah) = 14.0 min.
5. Press to store data
6. Press
or until
7 Press
to set Ah = 7.0 for battery
8. Press to store data
9. Press
to exit
Installation of new batteries:
When installing new batteries the procedure in 6.4 MUST be carried out, otherwise
the monitor may give false alarms.
Key in password
:
Last selected
parameter
Expected back-up
time [min.]: XXX.X
Data stored
Battery capacity
in [Ah]: XX.X
Battery capacity
in [Ah]: 7.0
Data stored
Normal operation
load power XX%
Expected back-up
time [min.]: 14.0
Programming parameters
Page view 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 118 119

Comments to this Manuals

No comments