APC MGE 6739380EN/JC User Manual Page 11

  • Download
  • Add to my manuals
  • Print
  • Page
    / 50
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 10
6739380EN/JC - Page 11
I
+–
!
!
O
2
beep...beep...
1
Example of an installation with an engine generator set
Installation with an engine
generator set
(figure 15)
If a stand-by generator is included in
the installation, it is generally started
automatically in the event of a
Mains failure and connected to the
main low voltage switchboard.
It is disconnected when Mains power is
restored.
With such a system, the required
battery time may be reduced to the
time necessary for starting and bringing
on line the stand-by generator.
The battery supplies power to the
inverter during the transfers:
Mains generator and
generator Mains.
The transfer sequences described:
Mains battery generator and
generator battery Mains are fully
automatic. They in no way affect the
load and require no manual operation
by the user.
Note:
To avoid load surges on the generator,
the rectifier/charger is started with a 10
second maximum current consumption
walk-in.
Fig. 15
UPS shutdown or overload
(systems with a static switch
module)
(figure 16)
Single-unit UPSs, modular UPSs or
UPSs with an SSC:
in the event of a UPS shutdown
(initiated by the user or by an internal
protective device), the load is
automatically transferred to the Mains 2
bypass line. If transfer conditions are
correct, transfer takes place instantly,
without interruption to the load.
Note:
Transfer conditions are not correct
when Mains 2 characteristics are
outside tolerances (voltage: +/-10%;
frequency as per personalization;
phase sync with inverter +/-3°);
in the event of a major transient
overload (greater than 160% of the full
load), immediate transfer takes place
as above, without interruption to the
load.
When the overload disappears, the
load is automatically returned to the
inverter depending on the configured
value of the re-transfer counter: no
return to inverter, or 1 to 255
(personalized value) overloads
accepted before the load is
permanently transferred to Mains 2.
This operating mode allows start-up of
load devices causing high inrush
currents.
Fig. 16
mains 2
mains 1
Galaxy
G
main LV
switchboard
generator
HV
network
mains 1
rectifier-
charger
battery
inverter
load
static switch
mains 2
Introduction (cont.)
This system requires correct transfer
conditions. If the conditions are not
correct, the inverter will current limit to
160% of its rated current for 1 second
before stopping;
in the event of a small but extended
overload (i.e. a continuous level of
power exceeding the full rated load),
the inverter will continue to supply
power for a period depending on the
magnitude of the overload (10 minutes
for a 125% overload, 1 minute for a
150% overload). See figure 17
(Overload curve);
in all three of the above cases, the
inverter shutsdown and supplies the
load via Mains 2 with the following
information on the control panel:
green "load protected" light 5 off,
buzzer 1 on,
red "load not protected" light 2 on.
Page view 10
1 2 ... 6 7 8 9 10 11 12 13 14 15 16 ... 49 50

Comments to this Manuals

No comments