Static Switch Cubicle
During maintenance, the Static Switch
Cubicle must be isolated from Mains 2,
the load and the parallel UPSs.
if work is required on the control
electronics alone, open cubicle switch
Q4S (but not Q5N) and cubicle fuse
switches Q1 and Q2. The load can then
remain supplied by the UPSs. After
servicing, reclose fuse switches Q1, Q2
and switch Q4S.
Caution:
When the Static Switch Cubicle is
powered down using the above
procedure, only the control electronics
are in fact powered down. The power
circuits remain energized. Maintenance
on the static switch power circuits
requires shutdown of the UPSs and
transfer of the load to the maintenance
bypass line.
open switch Q5N, then the
disconnector-fuses Q1 and Q2 in the
SSC;
open switches Q5N, then switch Q4S
on all the UPSs (figure 33).
Caution:
Even in the maintenance bypass
configuration, the cubicle is only
partially shut down and the supply
of power to the load continues via
switch Q3BP.
more extensive maintenance work
on the Static Switch Cubicle requires
the entire system to be shut down.
Fig. 33
Note:
We recommend that you call on the
after-sales support department to carry
out these operations.
Caution:
Battery maintenance is undertaken with
the system powered up. Operations
must be carried out in accordance with
applicable safety regulations by
qualified personnel using insulated
tools, gloves and safety goggles.
Batteries contain dangerous
substances that will harm the
environment if thrown away. If you
change the batteries yourself, call on
qualified organizations for battery
disposal and recycling.
Battery maintenance
Consult the instructions supplied by the
battery manufacturer. Below are a few
general indications:
sealed lead-acid batteries.
These batteries require no
maintenance:
but check the terminals of each cell
from time to time and clean if
necessary;
vented lead-acid batteries:
check the electrolyte level regularly
and add water if necessary,
check the voltage of each cell to
determine if it is necessary to equalize
the battery,
check the terminals of each cell and
clean if necessary.
In non-redundant systems with a
Mains 2, the load is supplied by the
Mains 2 and the Static Switch Cubicle.
In non-redundant systems without a
Mains 2, the entire system must be
shut down.
start-up
Following servicing, proceed in the
following order:
close switch Q1, then switches QF1,
Q5N and Q4S,
start the inverter (press the "inverter
on" button 6 ).
Note:
We recommend that you call on the
after-sales support department to carry
out these operations.
mains 1
load
mains 1
mains 2
QF1
QF1
Q1
Q1
Q5N
Q5N
Q5N
Q3BP
Q4S
Pb Pb
Maintenance (cont.)
Page view 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 49 50

Comments to this Manuals

No comments