12 APC Redundant Switch: Installation and Operation Manual
Installation
Turn o n the
equipment and
Redundant
Switch
1. Turn on all connected equipment.
2. To provide power to the equipment, press the
ON
button
of
UPS
-
A
to turn on the Redundant Switch and
UPS
-
B
.
3. To test whether the cables are connected correctly, press
the
OFF
button on one
UPS
.
– If it turns back on, the cabling is correct.
– If it does not turn back on, try swapping the two
UPS
communications cables to correct the problem.
Connect the
PowerChute
®
cable
When you are ready to install PowerChute
plus
, install the
PowerChute
plus
communications cable between the server
port of the Redundant Switch and your server’s serial port.
Note
To use PowerChute
plus
software to manage a
Redundant Switch configuration, your server
must be running Windows NT, Solaris, or
NetWare. See your PowerChute
plus
documentation for the operating system versions
that are supported.