APC INROOM ACPSC3000 Operations Instructions Page 47

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 46
InRoom CW/DX – Operating Instructions
(8.3)
(14.4)
(19.1)
(26.8)
(8.3)
(15.9)
(20.7)
(26.8)
(4.3)
(9.1)
(9.1)
(4.3)
47
Chilled Water 40 kw 66 kW 90 kW 110 kW 150 kW
L 1/2 CW CW CW CW CW
L 3/4 CW CW CW CW CW
L 5/6 CW CW CW CW CW
L 7/8 - - - - -
R 1/2 CW - CW CW CW
R 3/4 CW CW CW CW CW
R 5/6 CW CW CW - -
R 7/8 - - - - -
Ø chilled water [inch]
[mm]
1 3/8
35
1 5/8
42
2 1/8
54
2 3/4
70*
6.3.3.2 Pipe entrance area - Upfl ow units - CW
On Upfl ow units the supply pipes and cables enter the left or right side through openings in the side wall of
the units.
connection from the left side connection from the right side
All dimensions in mm (in)
*Attention: For 110 kW and 150 kW units,
connect 64 mm (2 1/2 in) diameter piping to
the 70 mm (2 3/4 in) threaded fi tting using
a reducing fi tting.
Front of
Unit
Page view 46
1 2 ... 42 43 44 45 46 47 48 49 50 51 52 ... 79 80

Comments to this Manuals

No comments