APC Smart-UPS VT Installation Manual Page 27

  • Download
  • Add to my manuals
  • Print
  • Page
    / 44
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 26
Installation
Smart-UPS
®
VT Maintenance Bypass Panel w Power Distribution, 10-30kVA, 208V - 990-4199B 21
Anchoring the MBP (optional)
The MBP (along with the UPS) can be anchored to the floor using the same stabilizing bracket and
hardware that was previously removed from the side of the UPS (refer to step 1, “Mechanically
connecting the MBP to the UPS” on page 16).
1. Place the stabilizing bracket against the open side of the MBP, aligning the bracket’s four (4)
“side” holes with the four (4) holes at the bottom of the MBP.
2. Mark desired anchor locations in the stabilizing bracket’s “floor” holes. A minimum of four (4)
M8 or larger anchors are recommended for each bracket. Consult APC Technical Support for
guidance concerning the use of anchor bolts in Smart-UPS VT configurations.
3. Remove stabilizing bracket and drill appropriate-size holes in marked locations on the floor.
4. Install anchor bolts in drilled holes.
5. Place the stabilizing bracket onto the anchor bolts, while again aligning the bracket’s four (4)
“side” holes with the four (4) holes at the bottom of the MBP.
6. Secure the stabilizing bracket to the MBP. Use an M10 nut driver to attach the four (4) M6
“side” screws and an appropriate tool to attach the floor anchors. Make side screws hand-tight.
Torque the floor anchors in accordance with their size.
Stabilizing Bracket
Panel Board Hinged Door
Side Panel
M6 “Side” Screw
(total of 4)
Floor Anchors
(minimum of 4)
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 43 44

Comments to this Manuals

No comments