APC AP9224 Datasheet Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 32
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
MasterSwitch VM: Installation and Quick-Start Manual 9
Installing MasterSwitch VM
b. Flat bracket, for a two-post rack. Using this bracket
may require you to drill holes in the rack.
2. Choose a suitable location for the unit. The following
example figure shows an
AP9227 or AP9228 model
mounted in four different locations in the enclosure.
The mounting procedure will vary according to the
location you choose. To avoid interfering with shelves or
equipment, install the unit so that it hangs on the outside
edge of the vertical rail, as shown in the figure. Installing
the unit may take some adjusting, depending on where
you want to install it:
To install any MasterSwitch VM unit in the rear of the
enclosure: Adjust the back rail to allow room for the
rear door to close. If necessary, adjust the front rail too.
To install an AP9227 or AP9228 MasterSwitch VM
unit on the side of the enclosure: Move the horizontal
cross members to the highest and lowest positions on
the vertical mounting rails.
To install an AP9227 or AP9228 MasterSwitch VM
unit into an expansion enclosure: Move the baying
brackets from the highest and lowest positions on the
rail (if they have not been moved since shipping) and
then move the horizontal cross members to the highest
and lowest positions on the vertical rails.
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 31 32

Comments to this Manuals

No comments