150 kW InfraStruXure Power Distribution Unit 39
Appendix A: Operation
How to Apply Power to the System
This procedure provides instruction for re-applying power to an already installed system. For initial
start-up instructions, see “Start-Up Procedure” on page 33.
1. Close (turn ON) the main circuit breaker for
the power source feeding the PDU.
2. Close (turn ON) the main input breaker on
the PDU.
3. Power the PDU distribution circuit breakers.:
a. Close (turn ON) the main output breaker
on the front of the PDU.
Note
When the main output circuit breaker is closed (turned ON), both PDU distribution
panels are energized.