APC InfraStruxure Specifications Page 22

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 21
14 InfraStruXure System—Installation and Start-Up
Connect the Power Source to the PDU
Access the PDU Main Input switch
Open the back doors of the PDU, unlock the top, smaller door, using the provided red key, and loosen
the two screws holding the larger, hinged door in place.
Attach conduit to the PDU for the input conductors
1. Remove the rectangular gland plate by loosening the captive screws, using a Phillips or standard
screwdriver:
In the bottom of the PDU for wiring under a raised floor
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 59 60

Comments to this Manuals

No comments