APC InfraStruXure Power Supply Specifications Page 34

  • Download
  • Add to my manuals
  • Print
  • Page
    / 92
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 33
System Start-Up: Start-Up Procedure
28 InfraStruXure 20kW System: Installation, Operation, and Maintenance
7. Set the DC Disconnect breaker to ON, and then set the System Enable switch to ON.
When the System Enable switch is in the ON position, the Startup screen appears on the display
interface, and then
the top-level status screen appears on the display interface. This changeover may take up to 40
seconds.
Start the InfraStruXure 20kW System using the display interface
PowerView RM
Rev: 000 English
Please wait...
Chrg %
Load %
Runtime:
||||||||||||
|||
1hr 2min
208Vin 000Vout 60Hz
1. Read the messages on the display interface:
Note any alarms and verify that they are
appropriate for start-up conditions.
Top-Level Status Screen
2. Command the UPS to apply power to the load:
a. Press the
ESC key to open the top-level
menu.
b. Select Control, and press the
ENTER key.
Top-Level Menu
c. Select Turn UPS Output On from the
Control menu, and press the
ENTER key.
Control Menu
Chrg %
Load %
Runtime:
||||||||||||
|||
1hr 2min
208Vin 000Vout 60Hz
Control
Status
Setup
Accessories
Logging
Display
Diags
Help
UPS Into Bypass
Do Self Test
Simulate Power Fail
Graceful Reboot
Graceful Turn Off
Start Runtime Cal
Turn UPS Output On
Page view 33
1 2 ... 29 30 31 32 33 34 35 36 37 38 39 ... 91 92

Comments to this Manuals

No comments