APC InfraStruXure Power Supply Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 92
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
2 InfraStruXure 20kW SystemInstallation, Operation, and Maintenance
Warnings
Receiving/moving
Do not tilt the InfraStruXure 20kW System greater than 45° from its vertical axis. Never lay the
InfraStruXure 20kW System on its side.
Installation/maintenance
Only a certified electrician can:
Connect the InfraStruXure 20kW System to utility
Connect a switch to the EPO interface on the InfraStruXure 20kW System
Install a customer-specified, hard-wired power cable
Only a certified electrician or an APC Field Service Engineer can perform maintenance of the
InfraStruXure 20kW System.
When connecting the InfraStruXure 20kW System to utility, a 90A circuit breaker must be installed
to protect the InfraStruXure 20kW System against over-current. The circuit breaker must have a
shunt trip.
Maintenance performed while the system is receiving input power
APC does not recommend maintenance while the system is receiving input power. However, due to
the critical nature of data center loads, maintenance while the system is receiving input power may
occur. If you must perform maintenance while the system is receiving input power, observe the
following precautions to reduce the risk of electric shock:
1. Never work alone.
2. Perform the maintenance only if you are a certified electrician who is trained in the hazards of
live electrical maintenance.
3. Know the procedure for disconnecting electricity to the system and the data center in case of an
emergency.
4. Wear appropriate personal protective equipment.
5. Use double-insulated tools.
6. Always follow local and site regulations when working on the system.
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 91 92

Comments to this Manuals

No comments