Operation: Procedures
50 InfraStruXure 20kW System: Installation, Operation, and Maintenance
How to return from maintenance bypass operation
1. Turn ON the Q1 switch.
2. If applicable, set the XR Battery Enclosure DC
Disconnect breaker to ON.
3. Set the DC Disconnect breaker to ON, and then
set the System Enable switch to ON.
The UPS will show a Forced Bypass message on
the display interface, and the Fault LED will be
red.
4. Command the UPS to apply power to the load:
a. Press the
E
SC
key at the Top-Level Status screen to
open the Top-Level Menu and have access to eight
submenus.
b. Select Control, and press the
E
NTER
key.
Top-Level Menu
Control
Status
Setup
Accessories
Logging
Display
Diags