APC 150kVA PDU W/ 480 PRI 208/120 SEC K1 XMER Specifications Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
10 150 kW InfraStruXure Power Distribution Unit
Emergency Power Off (EPO)
Overview
To provide a mechanism for applying emergency power off, attach a remote switch to the EPO
interface on the user connection plate. The EPO interface () is connected to the PDU monitoring
unit () by way of the user connection plate, which in turn connects to the main input breaker on the
PDU and to the internal EPO switch on an APC UPS or other APC-connected device ().
When EPO is activated, the main input breaker on the PDU opens (turns OFF). In addition, the enable
switch on the UPS opens (turns OFF) and the DC disconnect breakers serving the UPS open (turn
OFF). The last two actions negate power to the PDU from the UPS inverters and batteries.
Note
The main input breaker on the PDU is equipped with a shunt trip for emergency power
off. The shunt trip can be activated for EPO functionality by connecting an appropriate
power source (24 VAC or 24 VDC) to the EPO interface on the user connection plate.
Note
APC offers an optional InfraStruXure EPO system (EPW9). Contact your APC sales
representative, or visit the APC Web site (www.apc.com) for more information.
See “Connect an Emergency Power Off Switch” on page 17 for instructions on how to
connect an EPO switch to the PDU.
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 55 56

Comments to this Manuals

No comments