APC 150kVA PDU W/ 480 PRI 208/120 SEC K1 XMER Specifications Page 45

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 44
150 kW InfraStruXure Power Distribution Unit 37
Configure the InfraStruXure Manager
Once all equipment is installed, network cables have been connected to the InfraStruXure Manager
Hub (or Switch), and start-up of the system is complete, configure the InfraStruXure Manager.
See also
For instructions, see the Installation and Quick-Start manual included with your
InfraStruXure Manager.
Note
If using PowerChute Network Shutdown (PCNS) software with your InfraStruXure
UPS, your UPS must have a connection to the “User LAN” (public network) in order
for PCNS to function properly.
If the network management card installed in your UPS is connected to the
InfraStruXure Managers “APC LAN,” you must install a second network
management card in your UPS and connect it to the “User LAN” (public network) in
order to use PCNS.
Page view 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 55 56

Comments to this Manuals

No comments