APC 150kVA PDU W/ 480 PRI 208/120 SEC K1 XMER Specifications Page 51

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 50
Index
150 kW InfraStruXure Power Distribution Unit 43
A
Applying power to the system 33–
34, 37–38
Automatic transfer switches,
installing 25
C
Cable ladders, installing 24
Ceiling clearance 6
Circuit breaker size 2
D
Dimensions
InfraStruXure PDU 5
NetShelter VX enclosure 5
E
Electrical requirements 9
Emergency power off (EPO)
connecting the switch 17–20
overview 10
problems with 19
safety warnings 20
EMI warnings 4
Environmental management
system, installing 25
Environmental monitoring unit,
installing 25
F
Front clearance, minimum value 6
I
InfraStruXure Manager
configuring the 35
installing 25
routing data cables to the 30
InfraStruXure PDU
dimensions 5
electrical requirements 9
heat output 8
level the 13
maximum weight 7
Input conductors
attaching conduit for the 14–15
routing to the main input circuit
breaker 16
Input contacts
connect to the user connection
plate 21–22
Installation 13–30
connect the power source 14–16
connect user input contacts and
relay outputs 21–22
connecting an EPO switch 17–
20
install shielding troughs,
shielding partitions, and cable
ladders 23–24
level the PDU and NetShelter
enclosures 13
overview of basic procedure 11–
12
rack-mount devices 25
route and attach overhead wiring
26–28
warnings for 2
wiring under the floor 29
M
Main input breaker, accessing the 14
Maintenance, warnings 2
Moving the PDU, warnings 2
N
NetShelter VX enclosure
dimensions 5
level the 13
maximum weight 7
O
Operation 37–39
P
Power cables, routing to equipment
racks 26–28
Power source, connecting to the
PDU 14–16
R
Rack PDUs, installing 25
Rear clearance, minimum value 6
Receiving the PDU, warnings 2
Relay outputs
connecting to the user
connection plate 21–22
S
Safety 1–4
during start-up 31
symbols used in this manual 1
Shielding partitions
dimensions 5
installing 24
Shielding troughs
dimensions 5
installing 23
Site planning 5–12
basic installation procedure 11–
12
dimensions 5
electrical requirements 9
Emergency power off (EPO) 10
heat output 8
space considerations 6
weight considerations 7
Start-up procedure 31–34
T
Torque specifications, for wiring 16
Total power off procedure 3, 31–32,
39
Page view 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56

Comments to this Manuals

No comments