63Installation Guide Silcon DP300E 208V/480V 10-80 kVA
7OY0002 US rev. 04
Options/Accessories
**System OFF**
Normal operation
load power 0%
Display shows
Lamp indication
on bypass panel
Bypass operation
: YES
Bypass operation
: NO
Bypass operation
NOTE:
If battery has been discon-
nected please refer to
“Starting Up” in Chapter 5.0 to
connect battery(-ies) again.
DP300E
DP300E
Q003
Service
bypass
switch
H003
Q001a
Q001b
Q002b
Q004
Q002a
LoadMains
H004
H002aH002b
Single Mains
8.2.6.2 Switching the parallel system from external bypass into normal
UPS operation
Action
1. Check that the output switch (Q004) is in
position “0”
2. Check that all output switches (Q002) are
in position “0”
3. Turn input switches (Q001) to position “1”
4. Open the UPS front door and press the
green “ON” push-button
5. Press
on the keyboard
6. Press or on the keyboard until
7. Press on the keyboard
8. Press
on the keyboard
All systems will transfer to bypass operation
9. Check that all output switches (Q002) are in The green lamps (H002)
position “0” above all the output switch
handles (Q002) lights. The
green lamp (H004) above
the output switch (Q004)
handle also lights.
10. Turn all output switches (Q002) to position “1”
11. Turn the output switch (Q004) to position “1” The green lamps (H002)
above all the output switch
handles (Q002) light. The
green lamp (H004) above the
output switch (Q004) handle
and the green lamp (H003)
above the bypass switch
also light.
12. Turn the bypass switch (Q003) to position “0” The green lamps (H002) and
(H004) do not light any longer,
but (H003) will light until
normal operation.
Page view 62