APC 10-40kW 208/480V Installation Guide Page 73

  • Download
  • Add to my manuals
  • Print
  • Page
    / 119
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 72
73Installation Guide Silcon DP300E 208V/480V 10-80 kVA
7OY0002 US rev. 04
8.3.6.2 Switching the system from external bypass into normal
UPS operation
Action
1. Check that the output switch (Q002) is in
position “0”
2. Turn the input switch (Q001) to position “1”
3. Open the UPS front door and press the
green “ON” push-button
4. Press
on the keyboard
5. Press or on the keyboard until
6. Press on the keyboard
7. Press
on the keyboard
The system will transfer to bypass operation
8. Check that output switch (Q002) is in The green lamps (H002)
position “0” above the output switch
handle (Q002) lights.
9. Turn the output switch (Q002) to position “1” Now also the green lamp
(H003) above the bypass
switch handle (Q003) lights.
10. Turn the bypass switch (Q003) to position “0” Only the green lamp (H003)
above the bypass switch
handle (Q003) lights.
11. Press
on the keyboard
12. Press
or on the keyboard until
13. Press
on the keyboard
14. Press on the keyboard
The system will transfer to normal operation.
No lamps on the bypass panel light any longer.
Options/Accessories
NOTE:
If the battery has been dis-
connected please refer to
“Starting up” in chapter 5.0 to
connect battery(ies) again.
DP300E
Q003
Service
bypass
switch
H003
Q001
Q002
LoadMains
H002
Single Mains
**System OFF**
Normal operation
load power 0%
Display shows
Lamp indication
on bypass panel
Bypass operation
: YES
Bypass operation
: NO
Bypass operation
Bypass operation
: YES
Bypass operation
: NO
Normal operation
load power xx%
Page view 72
1 2 ... 68 69 70 71 72 73 74 75 76 77 78 ... 118 119

Comments to this Manuals

No comments