Start-up (cont.)
close fuse switch Q1 in the Static
Switch Cubicle;
close input switch Q1 on an UPS
line.
The line powers up;
red "load not protected" light 2 on
the line control panel goes on,
the RC automatically starts;
close the line battery circuit breaker
QF1;
close inverter output switch Q5N for
the line;
press the "inverter on" button 6 on
the line control panel;
green "load protected" light 5 blinks
for 3 seconds,
the inverter starts and awaits the
start of the other inverters;
proceed in the same manner for
each line;
when they are all on or enough have
been started to supply the rated load
power, the output switch for each
running line closes and the load is
supplied with power;
red "load not protected" light 2 goes
off,
green "load protected" light 5
remains on, without blinking, on the
control panel of each line supplying the
load.
Parallel UPS systems with a
Static Switch Cubicle
Proceed in the following order:
check that all lines supplying the load
are off or that the load is disconnected;
close the upstream switches
supplying Mains 1 and 2 power (on the
LV switchboard);
close fuse switch Q2 in the Static
Switch Cubicle (see figure 22);
close Mains 2 input switch Q4S in
the Static Switch Cubicle;
close switch Q5N in the Static Switch
Cubicle;
open maintenance bypass switch
Q3BP in the Static Switch Cubicle;
Start-up of a unit
Start-up of a rectifier/charger
it is recommended not to stop the
rectifier/charger because the battery
will no longer be charged. Rectifier/
charger start-up is automatic when
Mains 1 input switch Q1 is closed;
red "load not protected" light 2 on
the control panel goes on;
close battery circuit breaker QF1.
close battery circuit breaker QF1
(systems equipped with a battery);
close inverter output switch Q5N:
press the "inverter on" button 6 on
the control panel:
green "load protected" light 5 blinks
for 3 seconds,
the inverter starts and awaits the
start of the other inverters;
proceed in the same manner for
each line;
when they are all on or enough have
been started to supply the rated load,
the output switch for each running line
closes. The load is supplied and the
connected devices can be started,
red "load not protected" light 2
goes off,
green "load protected" light 5
remains constant, on the control panel
of each line supplying the load.
Frequency converters
Proceed in the following order:
check that all lines supplying the load
are off or that the load is disconnected;
close the upstream switch supplying
Mains 1 power (on the LV switchboard);
close Mains 1 input switch Q1.
The system powers up:
red "load not protected" light 2 on
the control panel goes on,
the rectifier-charger automatically
starts;
Q1 Q5N
OFF
ON
(0)
(I)
OFF
(0)
QF1
OFF
ON
(0)
(I)