Alarms
The autodiagnostic system considers
any system status other than normal as
a problem.
Prior to any other action, note any
lights (A to
N) on the hidden control
panel that may be on.
Also note any messages on the screen.
Certain problems may result in the
control panel not functioning.
In this case, it is strongly
recommended to call the after-sales
support department.
if the load is still correctly supplied
with power, it has probably been
transferred to Mains 2 (static switch)
and is therefore no longer protected;
if the load is no longer supplied with
power, transfer it manually to the
maintenance bypass (see section
below).
Maintenance bypass
Note:
in systems with a Static Switch
Cubicle, the above operation is carried
out in the Static Switch Cubicle;
the operation with the three switches
is carried out in reverse order (3, 2, 1)
to return to normal status;
in an installation comprising modular
UPSs with an external maintenance
bypass, the operation is carried out in
the external maintenance bypass. The
cubicle is not equipped with a Q4S
switch and it is therefore necessary to
open the protection devices upstream
on the maintenance-bypass line.
This operation is possible only if the
system includes a Mains 2. It results in
the load being directly supplied by
Mains 2 via maintenance bypass switch
Q3BP, thus ensuring a higher level of
security in the event of a malfunction.
Important:
Prior to beginning the bypass
operation, shut down all system
inverters (press the "inverter off" button
7 on each UPS control panel). If an
inverter remains operating and the
Mains 2 transfer conditions are not
correct, the load will suffer a 0.8 second
interruption.
Switching procedures are explained on
a drawing next to each switch. It is
imperative that the operation proceed in
the following order:
shut down any inverters that may
still be running;
1 : close maintenance bypass switch
Q3BP;
2 : open inverter output switch Q5N;
3 : open Mains 2 input switch Q4S:
Q1 Q4S Q3BP Q5N
1
2
3
bypass
OFF
ON
(0)
(I)
ON
(I)
ON
(I)
ON
(I)
OFF
ON
(0)
(I)
ON
(I)
ON
(I)
ON
(I)
ON
OFF
(I)
(0)
ON
(I)
ON
(I)
OFF
(0)
Page view 26
1 2 ... 22 23 24 25 26 27 28 29 30 31 32 ... 49 50

Comments to this Manuals

No comments