InfraStruXure 20kW System—Installation, Operation, and Maintenance 5
Overview
InfraStruXure 20kW System Components
Front view
Power cables—The cables
provide power to
equipment racks; they exit
the system through
knockouts on the roof of
the enclosure. The power
cables consist of five wires:
three phases, one neutral,
and one ground. The
number of power cables
installed depends on your
system’s configuration.
Each power cable has a
NEMA L21-20 outlet,
which accepts a variety of
APC InfraStruXure
accessories, including Rack
PDUs and the Automatic
Transfer Switch.
Main input gland plate—
This gland plate is used for
wiring access to the main
input terminals. When an
electrician connects utility
power to the system, this
gland plate guides the
conductors to the main
input terminals.
Wiring access cover—This cover is used for wiring access to the distribution circuit breaker
panel. Remove this plate when you add power cables or breakers to the system.
Display interface—The display interface is attached to the name plate on the front door of the
enclosure. It has an LCD, five-button interface, basic status lights, and a beeper.
Leveling feet—The feet adjust for leveling the enclosure. All enclosures must be level before
installation of the system begins.
Comments to this Manuals