Overview: InfraStruXure 20kW System Components
InfraStruXure 20kW System—Installation, Operation, and Maintenance 9
Main input connection options
Main input terminal block—The main input conductors (4W + G) land directly on this
terminal block. Access the terminal block through the main input gland plate.
Bottom entry main input terminal block—If you ordered this option, your main input
conductors (4W + G) land on this terminal block, which is wired to the main input terminal
block in the top of the system. Access the bottom terminal block through the floor access cover.