Maintenance: Adding Parts
70 InfraStruXure 20kW System: Installation, Operation, and Maintenance
How to add circuit breakers and power cables
Add a circuit breaker.
1. Remove the panel cover to access the circuit breaker panel.To remove, loosen the captive
screws at each corner of the cover and pull it off of the system.
2. At the circuit breaker panel, snap and bolt the new breaker into a position on the panel.
3. Remove the corresponding plastic blanking plate on the panel cover, and re-attach the cover to
the system.
Electr
i
cal
Hazard
Only licensed electricians or APC Field Service Engineers can add circuit
breakers and power cables to the system. Read the information in “Warnings”
on page 2 before beginning any work on the system.
C
aut
i
on
Any 3-phase power cable that is installed by an electrical contractor must be installed
with a 3-pole breaker.