Chapter 3:
How to Test a UPS
PowerNet MIB Reference Guide
24
OID Task
upsAdvTestDiagnosticSchedule Define the self-test schedule for the UPS:
• unknown (1): The Management Card or Agent cannot
determine the setting.
• biweekly (2): Self-tests will occur bi-weekly.
• weekly (3): A self-test will occur once every week.
• atTurnOn (4): A self-test will occur whenever the UPS turns
on.
• never (5): No self-test will be performed.
upsAdvTestDiagnostics Cause the UPS to perform an immediate self-test.
• noTestDiagnostics (1): The value always returned by a GET.
Setting this value has no effect.
• testDiagnostics (2): Perform the test.
upsAdvTestDiagnosticsResults View the result of the last self-test:
• ok (1):
• failed (2):
• invalidTest (3):
• testInProgress (4):
upsAdvTestLastDiagnosticDate View the date (in dd/mm/yy format) of the last UPS self-test.
Only smart-signalling PowerNet Agents use this OID.
upsAdvTestRuntimeCalibration Control a runtime calibration:
• noPerformCalibration (1): The value always returned by a
GET. Setting this value has no effect.
• performCalibration (2): Starts a runtime calibration, if the
UPS battery is at 100% capacity. If the battery capacity is not
at 100%, a SET of this value results in an invalidCalibration
setting for the upsAdvTestCalibrationResults OID.
• cancelCurrentCalibration (3): Cancels a runtime calibration.
Only a Management Card can use this OID.
upsAdvTestCalibrationResults View the result of the last runtime calibration:
• ok (1): The runtime calibration was successful.
• invalidCalibration (2): The last calibration requested did not
take place because battery capacity was less than 100%.
• calibrationInProgress (3): A calibration is occurring now.
upsAdvTestCalibrationDate View the date (in dd/mm/yy format) of the last runtime
calibration. Only smart-signalling PowerNet Agents use this
OID.
Comments to this Manuals